What should be checked before buying gold recovery equipment?

Five things decide whether the equipment is right, and none of them is a number on a specification sheet: the scale of the ore body, a test on a real sample, how serviceable the structure is, what the spare-parts list contains, and the lead time to your port.

Buying on parameters alone is how plants end up with a machine that is theoretically correct and practically wrong for the site.

Why do ore body scale and sample testing come first?

The ore body sets the maximum tonnage you will ever need, and a plant sized below it will be rebuilt. Seasonal variation matters too: a placer that runs clean gravel in the dry season can arrive as clay-bound feed in the wet season.

A sample test then establishes what the ore actually does — size distribution, clay behaviour, liberation. Recovery figures from a supplier who has never seen your material are claims about someone else’s deposit.

Why do serviceability, spares and lead time matter as much as capacity?

Gold recovery equipment runs in abrasive, wet, remote conditions. A structure that needs a crane and a specialist crew to change a screen panel will sit idle far longer than one with accessible fastenings.

Agree the spare-parts list at order time and ship consumables with the machine — screen panels, belt, bearings, rubber parts. A single air-freighted bearing usually costs more than the whole spare kit. Confirm the port and the delivery terms in writing before production starts.