01
Requirement review
The duty is read before any machine is named. Ore type, target throughput and site conditions decide which stage of the flow is actually limiting.
Buying the machine is the middle of the job. This is the sequence around it — what you send us, what we send back, and where our role stops.
Nothing here is a subscription or a retainer — each step is part of supplying a machine that suits the ore.
01
The duty is read before any machine is named. Ore type, target throughput and site conditions decide which stage of the flow is actually limiting.
02
The model is matched to the particle range and the duty rather than to the largest machine on the list. Where two sizes could work, we say which one we would choose and why.
03
Where a duty needs more than one machine, we set the sequence: washing and desliming, screening and sizing, roughing concentration, then cleaning. Each stage gets the equipment it needs, in the order the ore requires.
04
The machine is built at our own 7,100 m² plant in Shicheng and run on the floor before it is released. Changes to geometry, wear surfaces or the drive are decided in the workshop.
05
Export packing, technical files and certification documents are prepared for import clearance, and container or flat-rack loading is supervised by our export team.
06
Installation and commissioning are supported by our engineers, remotely or on site. Wear parts and replacement components are supplied through the working life of the machine.
Most suppliers leave this part out. It is more useful to you stated plainly, because it tells you what you still have to arrange yourself.
Send the ore type, the throughput you are targeting and the conditions on site. We will reply with the stage flow, the equipment for each stage, and the lead time.