Which decisions should a price cycle change, and which should it not?

A price cycle changes when it is comfortable to buy. It does not change what the ore needs. Separating those two questions is the whole discipline of buying equipment well: get the metallurgy right, then decide the timing.

The plants that regret a purchase are almost never the ones that bought at the wrong point in the cycle. They are the ones that sized the circuit around a budget rather than around the feed.

The four decisions worth settling before any quotation

Feed size distribution, clay behaviour, target product and its grade, and the water balance. Those four fix the stage count, and the stage count fixes the equipment list. A quotation that arrives before those four are settled is a price, not a design.

Add the site layout as a fifth constraint. A circuit that cannot be built on the ground you have is not a cheaper circuit — it is a redesign you will pay for twice.

What should never be chosen on price alone

Wear parts, spares availability and serviceability. Screen panels, slurry hoses, liners and bearings are consumed continuously, and a machine whose consumables are hard to source becomes expensive in a way the purchase invoice never shows.

When a cycle makes buyers cautious, the temptation is to compress the specification. Compressing the specification is how a plant ends up running below its design rate for years.