1. Water first
Freeze damage concentrates in water lines, pumps and valves, and it happens on the first cold night rather than gradually. Drain or trace-heat every line that will not be running continuously.
Screen spray bars are the most commonly missed item. A bar that freezes splits along its length and is not repairable on site.
2. Wear parts and lubricants
Rubber becomes brittle in low temperatures. Screen panels, slurry hoses and skirt rubber that survived the summer can crack on the first start-up below freezing. Inspect and replace before the season, not after the failure.
Switch to the lubricant grade specified for the ambient range you actually operate in. Grease that is correct at 20 °C may not channel through a bearing at −10 °C, and a starved bearing fails without warning.
3. Parameters that shift
Water viscosity rises as temperature falls, which changes settling behaviour in classifiers and thickeners. Expect to adjust spray volumes and, on some circuits, the feed density.
Slurry lines are the other point of change: a line that runs comfortably in summer can sand out in winter. Flushing at shutdown costs minutes; clearing a sanded line costs a shift.
4. A short checklist
Drain or heat-trace idle water lines. Check spray bars and valves. Inspect rubber parts for cracking. Confirm lubricant grade against the lowest expected ambient temperature. Flush slurry lines at every shutdown. Keep a spare set of the parts that fail first.