1. Where the water actually goes
Three points dominate consumption in a wet circuit: scrubbing, where clay has to be stripped off the particle surface; classification, where upward water or dilution keeps the pulp at a workable density; and tailings transport, which carries water out of the plant with the solids.
Measure the flow and the return at those three points before changing any machine. On many sites the circuit is not short of water — it is short of a return path. Fresh intake keeps running because the thickener overflow is going to the tailings pond instead of back to the scrubber.
2. Upgrade order: return water, then machines, then dewatering
Start with the return loop. Settling, thickening and a pump back to the wash or classification stage usually costs less than replacing a main machine, and it cuts fresh intake directly.
Only then look at the equipment: hold the overflow density on the screw washer, convert open sprays to directed sprays on the screen, and cut the dilution water on long conveying runs.
The last step is dewatering the fine tailings. Without it the return rate stays low no matter how good the upstream work is, and the tailings dam keeps taking slurry.
3. Three numbers that decide whether it pays
Fresh-water intake per tonne of ore, return-water rate, and tailings density. A week of site measurement gives all three, and they are more reliable than any estimate.
If the return rate is already high and intake will not come down further, the constraint is the process itself — typically a circuit that needs heavy dilution to run — not the machines.